RE: Road trip to Central Tablelands : March 23 2023

avatar

You are viewing a single comment's thread:

That floodwater made me change my tour plans around Euroa in October. Took two months for the flood waters to travel 800 kms to Murray Bridge



0
0
0.000
2 comments
avatar

Hopefully some water can stay in the river system longer term. It will certainly be healthy for the eco system.

0
0
0.000
avatar

This creek flows West to the Darling/Murray Basin - will take 6 months to reach the sea. Adding 53% capacity is bad for downstream for years and years.

0
0
0.000